Work Breakdown Structure overview
Use “Work Breakdown Structure overview” in Recued. It provides a focused, read-only view and leaves data in the connected service unchanged.
How it works
Inspect the data fetches, transforms, gates, and output this recipe runs.
Process (2 steps)
rows
recued-core.procore-work-breakdown-structure.cost_codes.list_cost_codes
List cost codes cost codes on procore work breakdown structure
scope
to_summary
Format results as a summary card
▼
Output
summary
scope
text
rows.result
Settings
Configurable at install. Defaults shown — change them anytime in Recued.
company id
setting
=
set at install
project id
setting
=
set at install
Uses (1 operation)
Pack operation
List cost codes cost codes on procore work breakdown structure
recued-core.procore-work-breakdown-structure.cost_codes.list_cost_codes
Trust & control
What installing this recipe would let it do. Recued grants these permissions at install — review them there before approving.