Recued
Menu
← Back to recipes

Update Smartsheet row

by recued-core v1 15 views

Use “Update Smartsheet row” in Recued. It runs the Smartsheet row update workflow with approval before changes are made.

How it works 7 steps

Inspect the data fetches, transforms, gates, and output this recipe runs.

Process (7 steps)
sheet_id trim
Trim whitespace from setting sheet id
row_id trim
Trim whitespace from setting row id
rows_json trim
Trim whitespace from setting rows json
reason trim
Trim whitespace from setting reason
row_before ?
update_rows ?
card to_summary
Format results as a summary card
Settings 5 configurable

Configurable at install. Defaults shown — change them anytime in Recued.

reason setting =
row id setting =
sheet id setting =
rows json setting = [{"id":0,"cells":[]}]
smartsheet setting =

Trust & control

What installing this recipe would let it do. Recued grants these permissions at install — review them there before approving.

Permissions it requires

Read your Smartsheet connection
Declared by the recipe — Recued grants these at install, where you review them before approving.

About

Tags

smartsheet smartsheetsheetsrowscellsapprovalwork-managementpack:smartsheet

Details

7 steps 5 configurable settings recipe_id: update-row-smartsheet